Installation Scheme

Keywords:Wire rope inspection, wire rope tester, wire rope defect, wire rope safety, wire rope;wire rope NDT; Conveyor belt inspection; Conveyor belt NDT ;Conveyor belt testing ;steel wire rope nondestructive testing


Due to the modular design, TCK Conveyor Belt Inspection System can simultaneously monitor four steel cord conveyor belts for their safe operation conditions, not only to independent monitoring of the entire conveyor belt, but also to meet the centralized monitoring of a number of conveyor belts according to customer request. The system has a simple structure, easy installation, stable operation, reliable performance, hardware and software have a good versatility and scalability.

Take the above figure as an example, 1. Loading device installed in the lower belt; 2. Testing unit also installed in the lower belt but behind loading device; 3. Distance Measuring Device installed at the upper surface of lower belt. As long as the return lower belt is flat belt and run more smoothly, we can facilitate the achievement of fixed installation; 4. Sound/light alarm; 6. Terminal control center installed in the controlling room.


TCK Wire Rope Inspection Technology Co., Ltd
Website: www.tck-cn.com;
Email:martinlian@tck-cn.com;



tckchinamartin tckchinamartin
26-30, M
Dec 11, 2012